The Elevator is growing

April 28, 2017

The elevator construction is going well in the Dwight Mission Heritage Center.  The elevator shaft is constructed of mason block, and is placed piece by piece.  

 The above picture is the shaft with a door opening in the basement.

 The picture above is the shaft extending through the main floor.

Check out our website: www.dwightmission.org for more construction pictures. 

 

Please reload

September 26, 2018

It is a rather amazing experience for couples to walk down an aisle accompanied by the sights and sounds of nature. Places like Dwight Mission provide a relaxing and stunningly beautiful atmosphere for guests to enjoy; there is  plenty of space for kids to play ; and they provide a picture perfect photo backdrop for one of the most important days of your life.

Please reload

Recent Posts

Please reload

Tags

Please reload

 (866) 298-1739   |   100995 South 4590 Road Vian, OK 74962    |    Fax 844-277-5536

GUEST SERVICES  /   CAMP CONDUCT HOTLINE  (888) 994-4866 

©2019 BY DWIGHT PRESBYTERIAN MISSION, INC.

  • Pinterest
  • YouTube Social  Icon